MC / THE WORKSHOP MANUALINDEPENDENT EDUCATION · MACHINERY SAFETY
MachineryComplianceTHE WORKSHOP MANUAL

PLATE 16 OF 20

Use, installation and maintenance.

The workplace side: installation, putting into service, inspection, and maintenance over the machine life.

PILLAR Installation and putting into serviceGUIDES 11REVIEWED 27 October 2026

Pillar guide

Installation and putting into service: Installation as a lifecycle phase with its own hazards, checks, and records, distinct from manufacture.

Supporting guides

GuideWhat it covers
Workplace inspection of machineryInspection duties that sit alongside product duties, and how the two layers are kept distinct.
Maintenance planning for safetyA maintenance plan built from the risk assessment, the instructions, and the safeguarding design.
Isolation and stored energyIsolating a machine and releasing stored energy before intervention, as a designed method.
Spare parts and safetyReplacement parts that match the assessed specification, and why an equivalent looking part may not be equivalent.
Training for machine usersTraining built from instructions and risk assessment, covering normal work and foreseeable intervention.
Supervision and safe useSupervision that checks safe use in practice, not just the existence of instructions.
Ageing machinery and safetyWear, corrosion, and obsolete parts over a long machine life, and how ageing is managed.
Second users and transferred machinesA machine transferred to a new user, with its instructions, history, and maintenance record going with it.
Decommissioning a machineTaking a machine out of service safely, including energy release, heavy parts, and disposal of hazardous materials.
A machine history recordOne record per machine that follows it from installation through maintenance, modification, and decommissioning.

Back to the full guide library · Back to the plate index