MC / THE WORKSHOP MANUALINDEPENDENT EDUCATION · MACHINERY SAFETY
MachineryComplianceTHE WORKSHOP MANUAL

PLATE 01 OF 20

Framework and transition.

How the EU machinery framework fits together, and how the 2027 changeover is handled.

PILLAR EU machinery law: the working frameworkGUIDES 12REVIEWED 27 October 2026

Pillar guide

EU machinery law: the working framework: Understand which machinery framework applies, what changes in 2027 and how to organise the evidence behind conformity.

Supporting guides

GuideWhat it covers
Machinery Regulation: the 2027 transitionThe general application date is 20 January 2027. Plan around the market event, not a blanket replacement of every existing machine.
Mapping Directive annexes to Regulation annexesA working map from Directive annex numbers to Regulation annex numbers, so old file references are checked before they are reused.
Placing on the market and making availableTwo supply events that are often confused, and why the distinction decides which framework applies to a product.
Provisions of the Regulation that apply earlySelected Regulation provisions apply before 20 January 2027, and they do not mean the full framework applies early.
Building a transition register for a product familyA register that shows, for each product family, where it stands on the move from Directive to Regulation.
What the 2027 date does not changeInstalled machines, historical declarations, and existing workplace duties do not all reset on 20 January 2027.
Declaring conformity with both frameworksWhen a declaration may state conformity with the Regulation as well, for machinery supplied before the cut-off.
How Regulation (EU) 2023/1230 is structuredArticles, annexes, and modules in the Regulation, read as a map before any single article is quoted.
How Directive 2006/42/EC is structuredThe current framework read as a map, so its annex references are used correctly while it still applies.
Using the consolidated Regulation textWhy the consolidated text of 27 July 2026, not an early summary, is the working copy for transition planning.
The framework as an importer sees itFor an importer, the transition turns on the placing event and on checks of the manufacturer conformity work.

Back to the full guide library · Back to the plate index